Integrating various aerial work functions such as arch installation, steel mesh laying, blasting, and charging.
Equipped with 2 booms and two working platforms, the workers are far away from the operating area and the working environment is safer;
Only 3 people can complete the blasting charge and arch installation and steel mesh laying, saving labor input of 3-4 people;
Installing one arch frame only takes 20-30 minutes, which accelerates the process cycle and can quickly complete the loading.
SAFER
MORE ECONOMICAL
MORE EFFICIENT
Application
Jiumian Expressway, China
Guanglian Expressway, China
Huanghuang Highspeed Railway, China
Yanchong Expressway, China
Solve our customers' key issues
Our solutions are designed to address our customers' key issues - including reduced operating costs, increased equipment utilisation, reduced environmental impact and improved health and safety requirements.
Uniroc is an international brand of Hunan Wuxin Tunnel Intelligent Equipment Co., Ltd. which is a listed company in Beijing Stock Exchange (stock code:920174).