Integrating various aerial work functions such as arch installation, steel mesh laying, blasting, and charging.
Dual power operation system, oil, and electricity mode free switching, optional air compressor according to the altitude, complete the clearing operation by itrself;
Equipped with a hole-clearing function, the extra-large working platform can accommodate 6-8 people at the same time, which can quickly complete the loading;
Only 4 people are needed to complete the arch installation and steel mesh laying, saving labor input of 3-4 people.
SAFER
MORE ECONOMICAL
MORE EFFICIENT
Application
No. 219 National Highway, China
Zhenguang Expressway, China
Yuwei Expressway, China
Xi'an Shiyan High speed Railway, China
Solve our customers' key issues
Our solutions are designed to address our customers' key issues - including reduced operating costs, increased equipment utilisation, reduced environmental impact and improved health and safety requirements.
Uniroc is an international brand of Hunan Wuxin Tunnel Intelligent Equipment Co., Ltd. which is a listed company in Beijing Stock Exchange (stock code:920174).