loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Platform Lifter HLG312E

5 0 Reviews
It integrates various aerial work functions such as arch installation, reinforcing mesh laying, blasting charging, etc. It can be applied to multi-bay arch prefabrication segmentation, multi-bay arch prefabrication folding, and single-bay arch folding operation schemes of highway and railroad full-section method and step method.
Availability:
Quantity:

Main features: 

Safety: Equipped with three robotic arms and three working platforms, the prefabricated arch installation effectively prevents falling rocks and improves operational safety;

High efficiency: fast positioning, three bays of arch and reinforcing mesh can be installed in 45 minutes, speeding up the process cycle;

Multi-functional: equipped with hole-clearing function, the extra-large working platform can accommodate 6-8 people at the same time, which can quickly complete the loading;

Save manpower: only 4 people can complete the arch installation and steel mesh laying, saving manpower investment of 3-4 people;

Convenient: Dual power operation system, free switching of oil and electricity modes, and optional air compressor according to altitude to complete hole cleaning operation on your own.


The main technical parameters:

Parameters of the machine

Total weight

32000kg

Overall dimensions (Length×Width×Height)

9200mmx3200mmx3500mm

Minimum construction section (W×H)

5m×6m

Maximum construction section (W×H)

18m×12m

Maximum walking speed

15km/h

Maximum gradient climb

35%

Approach angle

16°

Turning radius

11m

Departure angle

16°

Minimum ground clearance

400mm

Outrigger span (longitudinal)

4400mm

Main working arm

Control mode

Hydraulic control

Single arm rated load(kg)

3000kg

Lifting working width

±4m

Max. lifting height of main arm

12m

Number of telescopic stages

Level 2

Pitch angle

-20°~ +60°

Slewing angle

±22°

Mid-arm gripper

Maximum section width of steel section

260mm

Clamping force (kg)

1000kg

Pitch angle

-64°~ 22°

Jib gripper slewing angle

10°~60°

Jib gripper side turning angle

-20°~+60°

Slewing angle

±22°

Side arm

Number of side arms (pcs)

2 pcs

Single arm rated load (kg)

1000kg

Maximum lifting height

14m

Maximum width

18m

Slewing angle

-12°~ +46°

Pitch angle

-20°~ +58°

Number of telescopic stages

Level 2

Side arm manipulator slewing angle

-39°~69°

Side arm manipulator pitch angle

-5°~100

Side arm rigid gripper

Number of rigid grippers (pcs)

2 pcs

Adapt to the maximum arch section width (mm)

260mm 

Single claw clamping force (kg)

1000 

Pitch angle (°)

0°~ 90° 

Carrier

Engine power (kW)

96

Fuel tank volume (L)

180

Front overhang

1671mm

Rear overhang

1521mm

Wheelbase

4400mm

Front axle wheelbase

2480mm

Rear axle wheelbase

2480mm

Air compressor (optional)

Discharge volume

7m³/min

Pressure

8bar

Rated power

45kW

Rated voltage

380V

Hydraulic system

Hydraulic control mode

Load Sensitivity

Rated pressure of hydraulic pump

250bar

Hydraulic oil pump displacement

116L/min

Hydraulic oil tank volume

360L

Pressure oil and return oil precision

10μm

Electric system

Main motor power

37kW

Voltage /Frequency

380V/50Hz




Previous: 
Next: 
Leave a Message
Contact Us

Quick Links

Contact Us
  Email: 
tunnel@unirocgroup.com
 Address: 
No. 18-1 Panpan Road, Economic and Technological Development Zone, Changsha City, Hunan Province, China
Newsletter
If you are interested in our products, please leave your email and we will contact you.
 Copyright © 2022 Hunan Wuxin Tunnel Intelligent Equipment Co., Ltd. All Rights Reserved.