loading

Share to:

Platform lifter

Availability:
Quantity:


Arch installation; quality inspection, grouting, charging, anchor bolt installation and auxiliary roughening


1. Safety: As equipped with three mechanical arms and three working platforms, the workers can be kept far away from the construction area of the tunnel. Compared with the conventional construction method with the arch erection, the safety performance can be improved by 80%.


2. High-efficiency: It is capable of quickly and accurately positioning the arch frame with high efficiency, which improves the efficiency by 60% compared with the conventional construction method. As no external power supply is required, it can be operated conveniently. It only takes 20-30 minutes to install one arch frame, so as to speed up the process cycle.


3. Multi-function: As designed with three arm structures, it is applicable to various arch installation methods, which is suitable for erection operations in full-section, small steps and two steps. It is suitable for the steel arch installation, anchor bolt installation, anchor mesh installation, auxiliary roughening, quality check, grouting, tunnel equipment installation, etc.


4. Labor-saving: Only 4 people are needed for one equipment to complete the steel frame installation and reinforcement mesh laying, which can save 2-3 people.


5. Money-saving: The vehicle is equipped with the flexible chassis, which can cover multiple construction areas to reduce equipment investment.


6. Local/remote control: The local or remote control can be flexibly selected according to the difference of working conditions, which can bring about high adaptability.


Technical parameters

Chassis power

191kw

Maximum traveling speed

85km/h

Minimum turning radius

10m

Maximum gradeability

40%

Overall length

9980mm

Overall width

2800mm

Overall height

3500mm

Overall weight

30000kg

Lifting capacity

1000kg (main boom) 1000kg (auxiliary boom)

Maximum working horizontal width

±9m

Boom support pitch

-20°-﹢58°

Working platform rotation angle

120°

Minimum ground clearance

300mm

Wheelbase

1850mm+3200mm+1300mm

Front axle track

1960mm

Rear axle track

1860mm

Tire model

10.00R20

Tire diameter

1050mm

Drive mode

Rear wheel drive

Steering

Front wheel steering

Maximum lifting height of main boom

14m

Maximum lifting height of auxiliary boom

12.5m

Maximum working horizontal distance of auxiliary boom

15m

Swing angle of auxiliary boom

-12-+46°

Pitch of auxiliary manipulator

-20°-﹢90°


Previous: 
Next: 

Related Products

Leave a Message
Contact Us

Quick Links

Contact Us
  Email: 
 Address: 
No. 18-1 Panpan Road, Economic and Technological Development Zone, Changsha City, Hunan Province, China
Newsletter
If you are interested in our products, please leave your email and we will contact you.
 Copyright © 2022 Hunan Wuxin Tunnel Intelligent Equipment Co., Ltd. All Rights Reserved.