Tunneling Equipment

Intelligent Digital Pouring Lining Trolley ST12

Intelligent Digital Pouring Lining Trolley ST12

Further optimization is carried out on the automatic pouring lining trolley to realize the visualization;Intelligent concrete pouring for highway and railway tunnels, pumped-storage power stations, and hydropower stations.

FEATURES

1. High structural strength and simplicity, with exceptionally large space at the top, sides, and bottom, improving the working environment, increasing the ventilation cross-sectional area, and facilitating the movement of engineering vehicles;

2. The pouring process is fully computer-controlled, with automatic material distribution and automatic vibration, achieving standardized construction and improving the quality of concrete pouring.

3. Intelligent control: Simple and easy to learn, with one-click operation enabling full computer-controlled processes, reducing the number of personnel required for tasks;

4. Equipped with an information-based monitoring system, it transmits construction images and data via 5G networks, providing real-time warnings for abnormal pouring conditions, ensuring process controllability and traceability.

SPECIFICATIONS

Intelligent Digital Pouring Lining Trolley ST12

model
ST12

APPLICATIONS

Integrated terminals
Integrated terminals
Coal terminal
Coal terminal
inland ports
inland ports
bulk & general cargo terminals
bulk & general cargo terminals

SUCCESSFUL CASES