Platfrom lifter HLG312F
This equipment integrates arch frame installation, blasting charge loading, and aerial auxiliary operations, and is primarily applicable to the construction of Class II and Class III highway tunnels.
This equipment integrates arch frame installation, blasting charge loading, and aerial auxiliary operations, and is primarily applicable to the construction of Class II and Class III highway tunnels.
This equipment integrates multiple aerial operation functions including arch frame installation, rebar mesh laying, blasting charge loading, and anchor bolt installation.
dataization, intelligence and informationization of tunnel lining;Suitable for laying geotextiles, waterproof boards, and auxiliary steel reinforcement binding operations on single track railways, double track railways, double track highways, and triple track highway tunnels.
Further optimization is carried out on the automatic pouring lining trolley to realize the visualization;Intelligent concrete pouring for highway and railway tunnels, pumped-storage power stations, and hydropower stations.
The overall design features a compact size, light weight, and high flexibility, enabling demolding maintenance, automatic maintenance, and intelligent maintenance—making lining maintenance more timely and efficient.
The hydraulic ditch cable trough is controlled by a hydraulic system to move the template up and down, left and right, adjust the plane position and top elevation of the templates on both sides, and ensure that the template positioning meets the structural size requirements of the ditch cable trough.