Platfrom lifter HLG312M
This equipment integrates multiple aerial operation functions including arch frame installation, rebar mesh laying, blasting charge loading, and anchor bolt installation.
This equipment integrates multiple aerial operation functions including arch frame installation, rebar mesh laying, blasting charge loading, and anchor bolt installation.
dataization, intelligence and informationization of tunnel lining;Suitable for laying geotextiles, waterproof boards, and auxiliary steel reinforcement binding operations on single track railways, double track railways, double track highways, and triple track highway tunnels.
Further optimization is carried out on the automatic pouring lining trolley to realize the visualization;Intelligent concrete pouring for highway and railway tunnels, pumped-storage power stations, and hydropower stations.
The overall design features a compact size, light weight, and high flexibility, enabling demolding maintenance, automatic maintenance, and intelligent maintenance—making lining maintenance more timely and efficient.
The hydraulic ditch cable trough is controlled by a hydraulic system to move the template up and down, left and right, adjust the plane position and top elevation of the templates on both sides, and ensure that the template positioning meets the structural size requirements of the ditch cable trough.
The self-propelled hydraulic inverted arch wharf is a professional equipment for the full width construction and filling of inverted arches in railway, highway double track, and single track tunnels. It provides a small flow operation working face for inverted arch construction and meets the needs of one-time molding and rapid construction of tunnel inverted arch concrete. Our company's self-developed and produced self-propelled hydraulic arch wharf adopts an integrated design of electromechanical and hydraulic systems, and has obtained more than 120 national patents, including 15 invention patents.